Skip to main content
Call Us Now +44 (0) 1895 822 292
Search

What are you looking for?

  • UK

  • IE

  • DE

  • DK

  • About Us
    • About Us
    • BIM Level 2
    • Innovation
    • Our History
    • Our Team
    • Core Leadership
    • Careers
    • Awards
  • Services
    • Services
    • SCAFFOLDING
    • HOISTS
    • MAST CLIMBERS
    • TEMPORARY WORKS DESIGN
    • SPECIAL PROJECTS
  • Projects
  • Health & Safety
    • Health & Safety
    • Social Value
    • Certifications
    • IPAF Training
  • News
  • Get in Touch
  • UK

  • IE

  • DE

  • DK

Chase Farm Hospital

Publications
News & Insights

Chase Farm Hospital

Chase Farm Hospital Redevelopment is a design and build of a new 5-storey Hospital, Energy Centre and Multi storey car…

London Stadium Seating Relocation

The careful dismantling and re-erection of the Queen Elizabeth Olympic Park (QEOP) stadium structure using a number of different plant,…

Sayer Street Installation

TRANSFORM & RECONNECT.   Sayer Street is part of a £2.3 billion retail/leisure regeneration scheme in Elephant & Castle, London.…

Cabot Circus, Bristol

SPECIFICATIONS This project was the largest regeneration of Bristol since the war and saw the entire Broadmead area go under…

Cannon Street Bloomberg – Sir Robert McAlpine

Cannon Street is a gantry encircling the site of the new Bloomberg European headquarters. The gantry permits access into the…

BBC White City – Scudders

PHD erected Access Layher Scaffold, to the Scudder facetted perimeter of the rotunda at the BBC Studios Wood Lane, a Listed Building, enabling safe demolition works. A hoist is tied to the PHD scaffold for removal of rubble & debris and the scaffold is Monarflex sheeted for protection. As the building is listed PHD had to overcome the challenge of fixing the scaffold safely and tying in without damaging any of the existing building.

Bloomberg LP European HQ

Sir Robert Mc Alpine’s Bloomberg Place project is the largest development in The City of London and PHD Modular Access have secured the access & scaffold package from valued logistics client, Avondale Construction Ltd. PHD’s works comprise of a Public pedestrian access and goods loading gantry over Cannon Street ( 117m x 3m x 4m high) and Queen Victoria Street (87m x 3m x 4m high).  This enables safe access to the perimeter of the massive site in the middle of The City for the Public as well as the safe unloading and distribution of materials into the site which has the full footprint

Abu Dhabi Financial Centre

PHD assists in creating new financial hub for the Middle East. The AD Financial Centre (Sowwah Square) has been designed…

Tate Modern Gallery

In 1995 Swiss architects Herzog & De Meuron were appointed to convert the former Bankside Power Station into a modern…

London Stadium – Queen Elizabeth Olympic Park

The Stadium Roof Strengthening & Transformation of Queen Elizabeth Olympic Park Stadium is a pinnacle of technical prowess. Even more importantly, it should be appreciated that PHD’s radical methodology dramatically reduced the safety risks, associated with the Stadium Roof Strengthening & Transformation works being carried out 37m above the ground, by obviating the need for 256,000 scaffold components (0.8kg each) – each a potential risk hazard falling from height!

Page 1 of 212»
  • Special Projects
  • TEMPORARY WORKS DESIGN
  • Mast Climbers
  • Hoists
  • Scaffolding

accreditation's

Quick links

  • Cookies
  • Privacy Policy
  • Modern Slavery Policy
  • Site Map

Services

  • Scaffolding
  • Hoists
  • Mast Climbers
  • Temporary Works Design
  • Special Projects

Get In Touch

+44 (0) 1895 822 292

[email protected]

54 Oxford Road, Denham, UB9 4DN

© PHD Access 2025. All rights reserved.
Web Design by Xanda Ltd Xanda logo
This website uses cookies to store information on your computer. See our cookie policy for details on how to block cookies.
I am happy to proceed