Operatives had to access the high level compression Truss 43m above the concourse area at the Queen Elizabeth Olympic Park.

To suspend scaffold from the elliptical steel truss, MEWPs were ruled out due to low level projecting Structures and it became impossible to use conventional scaffold due to loadings being imposed onto the concourse level slab –

Solution: PHD used their in House IRATA trained Rope access scaffold riggers.